IMP Threat Assessment & Reassessment
Select the applicable B31.8S threats for recommended assessment methods/intervals, the Subpart O IMP element checklist, and an overdue flag.

Threats (B31.8S)

Threats (cont.)

Context

yr

Engineering Basis

  • Nine B31.8S threats in three time-classes (time-dependent / stable / time-independent).
  • Assessment method per threat: ILI (MFL/EMAT), Direct Assessment (ECDA/ICDA/SCCDA), or hydrostatic test โ€” adjusted for ILI-capability and pressure cycling.
  • Reassessment โ‰ค7 yr in HCAs (Subpart O); non-HCA/MCA per ยง192.710 (โ‰ค10 yr typ.).