LDAR Program Economics

Methane Β· $/tCOβ‚‚e abatement Β· EPA OOOOa

LDAR (Leak Detection and Repair) Economics
Marginal cost of methane abatement ($/t CHβ‚„ and $/tCOβ‚‚e) for an LDAR program: component count, leak fraction, survey/repair cost, recovered gas value, and net societal benefit at the EPA Social Cost of Carbon. Per EPA OOOOa/b/c, EPA Subpart W, OGMP 2.0.

Facility Inventory

β€”
%
kg/h

Program Cost

/yr
$/survey
$/leak
%

Economics

$/mscf
β€”
$/tCOβ‚‚

Engineering Basis

  • EPA OOOOa requires quarterly OGI camera surveys for compressor stations.
  • Avg leak rate 0.05 kg/h is EPA Subpart W default for "leak" components.
  • Repair efficiency 90–95% typical (some leaks recur within months).
  • GWP CHβ‚„ = 28 (IPCC AR5 100-yr); GWP-20 (84) used for short-term focus.
  • SCC default $51/tCOβ‚‚ β€” EPA 2023 interim value.
  • Standards: EPA OOOOa/b/c, EPA Subpart W, EPA AP-42 Β§5.3, API Compendium, OGMP 2.0.