1. Basic Relationships
Gas inventory, flow rate, and time are connected through the fundamental relationship: Volume = Rate × Time. For compressible gas, pressure and temperature must be considered.
Basic Equations
Unit Conversions
| Rate Unit | To SCFH | To SCFM |
|---|---|---|
| MMSCFD | × 41,667 | × 694.4 |
| MSCFH | × 1,000 | × 16.67 |
| SCFM | × 60 | × 1 |
| ACFM (at P, T) | × 60 × P/14.7 × 520/T / Z | × P/14.7 × 520/T / Z |
2. Gas Inventory Calculations
Gas inventory in a vessel or pipeline depends on physical volume, pressure, temperature, and compressibility.
Inventory Formula
Pipeline Line Pack
Vessel Inventory
Example: Pipeline Inventory
Given: 20" × 0.500" pipeline, 50 miles, 800 psia average, 60°F, Z = 0.88
d = 20 - 1.0 = 19 inches
V = 0.00545 × 19² × 5,280 × 50 = 5.20 MM ft³
SCF = 5.20×10⁶ × 800 × 35.37 / (520 × 0.88)
SCF = 322 MMSCF line pack
3. Fill Time
Time to pressurize a system depends on volume, target pressure, and available flow rate.
Constant Rate Fill
Vessel Pressurization
Example: Vessel Fill Time
Given: 1,000 gallon vessel (134 ft³), fill from 0 to 500 psig at 50 SCFM
Final SCF = 134 × 514.7 × 35.37 / (520 × 0.95)
Final SCF = 4,940 SCF
t = 4,940 / 50 = 99 minutes
4. Blowdown Time
Blowdown (depressurization) is not constant-rate—flow decreases as pressure drops through a restriction.
Choked Flow Blowdown
Approximate Blowdown Time
API 521 Depressuring Rate
Example: Blowdown Time
Given: 500 ft³ vessel at 1,000 psig, blowdown through 1" orifice (0.785 in²), C_d = 0.7
Blowdown from 1015 psia to 115 psia (100 psig):
ln(1015/115) = ln(8.83) = 2.18
t ≈ 1.5 × 500 × 2.18 / (0.785 × 0.7 × √1015)
t ≈ 1,635 / (0.55 × 31.9)
t ≈ 93 seconds
5. Applications
Common Uses
| Application | Calculation Purpose |
|---|---|
| Pipeline operations | Line pack changes, pack/draft times |
| Compressor startup | Suction header pressurization time |
| Emergency depressuring | BDV sizing, blowdown time verification |
| Purging operations | Nitrogen volume and time requirements |
| Leak testing | Pressure decay rate analysis |
| Storage operations | Injection/withdrawal scheduling |
Line Pack Management
Nitrogen Purge Calculations
References
- API 521 – Pressure-Relieving and Depressuring Systems
- GPSA, Section 17
- ASME B31.8 – Gas Transmission Piping
Ready to use the calculator?